Required Paperwork

All projects where FEMA-designated floodplain exists on the lot or tract:

Grading in the floodway also requires:

New construction or substantial improvement of a structure on a lot that has FEMA-designated floodplain on it, but the structure will not be located within the FEMA-designated floodplain also requires:

New construction or substantial improvement of residential structure (home) or a non-residential structure that will be elevated to 1 foot + BFE and where the structure will be located within the FEMA-designated floodplain also requires:

New construction or substantial improvement of a non-residential structure that will not be elevated to 1 foot above BFE that will be dry floodproofed also requires:

New construction or substantial improvement of a non-residential structure that will not be elevated to 1 foot above BFE that will be wet floodproofed also requires:

Placement of a pressurized or flammable liquid tank also requires:

Non-substantial improvements also require detailed cost estimates of work to be completed based on RS Means Construction Cost Estimating Guide and value of the structure separate from value of the land.